Construction activity conducted adjacent to live traffic is a complex and hazardous to both workers and traffic users. Without proper supporting infrastructure, there are higher risk of accidents involving workers and road users. In major city like Kuala Lumpur and Klang Valley, traffic congestion could be a real problem around construction site without proper planning of workers/pedestrian flow around the site, especially when crossing a live traffic. Hence a proper temporary infrastructure are needed to mobilise workers or pedestrian safely and efficiently.

DXS Dscaff have a solution to mitigate the risks above by providing a temporary pedestrian/workers crossing.

Short Span Pedestrian Bridge (SSPB) utilize modular alloy frame for the main truss connected together with spigots. Plan bracing and side bracing using standard tubes and coupler arrangement. Decking which can be either Aluminium deck with plywood or steel deck sits on bottom chord of the trusses. Standard bridge width is 1.0m and can span up to 16m length. Complete bridge assembly can be carried out on the ground before lifted into position by cranes. Assembly is faster with trusses connected with spigots, and bracing utilizing clip-in-hook connection.

 

Types

 

Load Specification

SPECIFICATIONS:  PERMISSIBLE LOAD AGAINST VARIATION OF BRIDGE SPAN (SSPB) FOR SINGLE TRUSS AND DOUBLE TRUSS

Permissible load on the platform and bracing arrangement varies according to bridge span.Heavy duty load (> 5kN/m²) with 5.0 m side brace and plan brace applies for span less than 10 m and the Light duty load (< 5kN/m²) with 5.0 m side brace and plan brace applies for span more than 10 m.

ALUMINIUM DECK (width x length) : 0.50m x 2.5m  (DXS-Deck 2500)

STEEL DECK           (width x length) : 0.23m x 2.5m  (DE-000-DS3DL)

Load_ Specification

Short Span Pedestrian Bridge (SSPB) utilize modular alloy frame for the main truss connected together with spigots. Plan bracing and side bracing using standard tubes and coupler arrangement. Decking which can be either Aluminium deck with plywood or steel deck sits on bottom chord of the trusses. Standard bridge width is 1.0m and can span up to 16m length. Complete bridge assembly can be carried out on the ground before lifted into position by cranes. Assembly is faster with trusses connected with spigots, and bracing utilizing clip-in-hook connection.

LONG SPAN PEDESTRIAN BRIDGELONG SPAN PEDESTRIAN BRIDGELONG SPAN PEDESTRIAN BRIDGE

 

Load Specification

long load specification

 

TEMPORARY BRIDGE ApplicationSystem can be utilised for easily constructing temporary walkways and footbridges,for instance,in;

  • Construction sites ,e.g. temporary crossover on public highway
  • Footbridge across river
  • Footbridge walkway for emergency relief operation,e.g. flooding
  • Railway stations refurbishment

and in any situations where public access need to be maintained while construction work is in progress.