Pedestrian Bridge for TRX construction site, LendLease. - Dscaff DXS Engineering
143
portfolio_page-template-default,single,single-portfolio_page,postid-143,qode-quick-links-1.0,ajax_fade,page_not_loaded,,qode-child-theme-ver-1.0.0,qode-theme-ver-11.1,qode-theme-bridge,wpb-js-composer js-comp-ver-5.1.1,vc_responsive
 

Pedestrian Bridge for TRX construction site, LendLease.

  • temporary pedestrian bridge
  • temporary pedestrian bridge
  • temporary pedestrian bridge
  • temporary pedestrian bridge
About This Project
  • Dscaff have been awarded an Engineering, Supply and Installation contract for a pedestrian bridge by Lend Lease Malaysia Projects. The 35m long bridge is to allow workers safe access to and from the Prestigious Lifestyle project at Tun Razak Exchange. ( TRX )
  • The 2.5meter wide bridge can safely support up to 300 workers at one time to cater for peak hour foot traffic.
  • The modular designed bridge was safely built at ground level, The 4.2 MT main structure was lifted in one piece onto pre-prepared modular stair and supporting towers using an 80 MT capacity crane.
  • This is a great example of the smooth integration between Dscaff products, which include, DXS bridging, SAS modular scaffolding and shoring¬†with DSS safety barriers.
Category
Special Access Platform